In 2016, Blue Wind Aviation Ltd completed a major project to restore the L-410UVP-E aircraft. Maintenance and engineering activities included:
• Revision 2
• Overhaul of both motors and propellers
• Repainting the aircraft
• Replacing radio stations with ones that have an 8.33MHz capabilities
• Restoration of the entire interior (cockpit and cargo cabin)
• Full inspection of the equipment on board
• Replacement of all time-limited components
• Test flight and engine runs
