In 2017 Blue Wind Aviation Ltd. has completed an extremely important project related to the work of 1 pc. DA-42 and 2 pcs. DA-40. Maintenance and engineering activities included:
• Repair and restoration of aircraft
• Modification of DA-42, including replacement of 1.7-liter 2.0-liter engines
• Check and fully update the Garmin G1000 Legacy navigation system
• Full inspection of the equipment on board and replacement of all components that do not comply with the technical requirements
• Replacement of all time-limited components
• Test flights
